For most of a decade, state and federal agencies had “determined that an alternative must provide a limited-access connection between I-395 and Route 9 east of Route 46 [and] Alternatives that would connect to Route 9 west of Route 46 would severely impact local communities along Route 9 [and] would substantially increase the potential for new safety concerns and hazards.” Instead, the MaineDOT opted to construct an alternative that did not satisfy that decade-long established Study Purpose or the System Linkage Need and the Traffic Congestion Need.
"I-395/Route 9 Hard Look"
Skip to content
  • Home
  • Facts
    • Letter to the OIG
    • Substantive 2B-2 Facts
    • 2013 FOAA (GH)
    • LD47 Testimony (LA)
    • LD47 Testimony (GH)
    • STIP Comments (GH)
    • STIP Comments (LA)
    • BACTS Testimony (LA)
    • BACTS Testimony (SB)
    • Brewer Boondoggle
    • History was dismissed…
    • We have no money…
    • LD783 Testimony (LS)
    • LD783 Testimony (LA)
    • A viable solution
    • Ides of March 2020
    • What’s the real cost?
    • Virtual Meeting Aug. 2020
    • Strong Towns Article
  • Issues
    • Unmet Purpose & Needs
    • Safety Concerns
    • Change in Route Design
    • Wasted Taxpayer $$
    • Maine’s Unmet Needs
  • Ancillary
    • “Biweekly” DOT Updates
    • Voices of Reason
    • FOAA Discovery
    • Unanswered Questions
    • Important Documents
    • PAC Meetings
  • Maps
    • GIS Data
    • Preliminary Drawings
    • Partial C/L Alignment
    • Official maps – 6.27.2018
    • Prior Mitigation
    • Construction Plans
  • Media
    • Newspapers
    • Letters to the Editor
    • Broadcast Media
    • The early years in the BDN
  • Newsletters
  • Years
    • 2015 News
    • 2016 News
    • 2017 News
    • 2018 News
    • 2019 News
    • 2020 News
    • 2021 News
    • 2022 News
    • 2023 News
    • 2024 News
    • 2025 News
  • Gorham Connector

Change in Route Design

Capture113

separator-1-2017

Capture13Click here to read the entire document.

Capture73

Capture15Click here to read the entire document.

Capture73

Capture16Click here to read the entire document.

Capture73

Capture17

Capture18Click here to read the entire document.

Capture73

Capture19Click here to read the entire document.

Capture73

Capture20Click here to read the entire document.

Capture73

Capture21Click here to read the entire document.

Capture73

Capture48Click here to read the entire document.

Capture73

Capture49Click here to read the entire document.

Capture73

Capture64Click here to read the entire document.

Capture73

Capture45Click here to read the entire document.

Capture73

Capture46

Click here to read the entire document.Capture73

Capture47Click here to read the entire document.Capture73

Capture51Click here to read the entire document.

Capture73

Capture52Click here to read the entire document.

Capture73

Capture56Click here to read the entire document.

Capture73

Capture59

Click here to read the entire document.Capture73

Capture55Click here to read the entire report – sponsored by the TexasDOT and the FHWA.

Capture73

Capture65Click here to read the entire document.Capture73

Capture63Click here to read the entire document.Capture73

Capture114

Capture89

Capture50

Click here to read the entire document.

Capture73

Capture37

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • header image text

  • separator

  • veteran owned

    veteran owned
  • separator

  • Archie

  • no 2B-2

  • Loss of gas tax revenues

  • Loss of gas revunues over 18 months

  • No 2B-2

  • Van Note says: Too damn close.

  • no 2B-2

  • Steve on Channel 7

  • no 2b2

  • BACTS Bost

  • no 2B-2

  • Pinochio

  • Van Note – system will suffer

  • Pinochio

  • Chief Engineer

  • no 2B-2

  • Wiscasset Bypass

  • No 2B-2

  • East of Route 46

  • no 2b2

    no 2b2
  • funding system is broken

    funding system is broken
  • no 2b2

    no 2b2
  • 16 percent more

    16 percent more
  • no 2b2

    no 2b2
  • TRIP statistics

    TRIP statistics
  • no 2B-2

  • VanNote aug 2019 rev1

    VanNote aug 2019 rev1
  • no 2b2

    no 2b2
  • Bonds

    Bonds
  • no 2b2

    no 2b2
  • losing ground

    losing ground
  • no 2b2

    no 2b2
  • boondoggle

    boondoggle
  • no 2b2

    no 2b2
  • struggling

  • no 2B-2

  • more miles makes no sense

  • no 2B-2

  • no new infrastructure

  • no 2B-2

  • Search

  • thanks to Gretchen

    thanks to Gretchen
  • SSL

  • copyright

    copyright
"I-395/Route 9 Hard Look"
Proudly powered by WordPress.