"I-395/Route 9 Hard Look"
For most of a decade, state and federal agencies had “determined that an alternative must provide a limited-access connection between I-395 and Route 9 east of Route 46 [and] Alternatives that would connect to Route 9 west of Route 46 would severely impact local communities along Route 9 [and] would substantially increase the potential for new safety concerns and hazards.” Instead, the MaineDOT opted to construct an alternative that did not satisfy that decade-long established Study Purpose or the System Linkage Need and the Traffic Congestion Need.
"I-395/Route 9 Hard Look"
Skip to content
  • Home
  • Facts
    • Letter to the OIG
    • Substantive 2B-2 Facts
    • 2013 FOAA (GH)
    • LD47 Testimony (LA)
    • LD47 Testimony (GH)
    • STIP Comments (GH)
    • STIP Comments (LA)
    • BACTS Testimony (LA)
    • BACTS Testimony (SB)
    • Brewer Boondoggle
    • History was dismissed…
    • We have no money…
    • LD783 Testimony (LS)
    • LD783 Testimony (LA)
    • A viable solution
    • Ides of March 2020
    • What’s the real cost?
    • Virtual Meeting Aug. 2020
    • Strong Towns Article
  • Issues
    • Unmet Purpose & Needs
    • Safety Concerns
    • Change in Route Design
    • Wasted Taxpayer $$
    • Maine’s Unmet Needs
  • Ancillary
    • “Biweekly” DOT Updates
    • Voices of Reason
    • FOAA Discovery
    • Unanswered Questions
    • Important Documents
    • PAC Meetings
  • Maps
    • GIS Data
    • Preliminary Drawings
    • Partial C/L Alignment
    • Official maps – 6.27.2018
    • Prior Mitigation
    • Construction Plans
  • Media
    • Newspapers
    • Letters to the Editor
    • Broadcast Media
    • The early years in the BDN
  • Newsletters
  • Years
    • 2015 News
    • 2016 News
    • 2017 News
    • 2018 News
    • 2019 News
    • 2020 News
    • 2021 News
    • 2022 News
    • 2023 News
    • 2024 News
    • 2025 News
  • Gorham Connector

Issues

12.7.2015 b Capture

1.13.2017

Click links below or from the header menu ribbon:

Unmet Purpose and Needs

Safety Concerns

Change in Route Design

Wasted Taxpayer $$

Maine’s Unmet Transportation Needs

 

 

Capture177

Click here to read entire document.

Capture73

Capture85

Capture66a

Click here to read entire document.

.

Click here to view on YouTube.

Capture73

Capture87

Capture86

Capture67Click here to read entire document.

.

Click here to view on YouTube.

Capture73

Capture89

Capture88

Capture68Click here to read entire document.

.

Click here to view on YouTube.

Capture73

Capture91

Capture69Click here to read entire document.

.

Click here to view on YouTube.

Capture73

 Capture92

Capture80Click here to read entire document.

Capture73

 Capture48

Click here to read entire document.

Capture73

Capture94

Capture81Click here to read entire document.

Capture73

 Capture95

Capture82Click here to read entire document.

Capture73

  Capture96

 Capture83Click here to read entire document.

Capture73

 Capture97

Capture84Click here to read entire document.

Capture73

Capture98

Capture51

Capture69

Capture73

1.16.15b

1.16.15a

 

1.28.15a

1.17.15a

Click here to follow the progress of this bill.

Click here to read the Bangor Daily News article.

1.21.15a

Capture73

Capture99

Capture85

Click here to read entire document.

Capture73

 Capture49

 Capture56Capture73

Capture100

Capture86Click here to read entire document.

Capture73

 Capture101

 Capture87Click here to read entire document.

Capture73

 

Capture91

 Click here to read entire document.

Capture73

 Capture102

Capture92 Click here to read entire document.

Capture73

Capture103

Capture93

Click here to view full size document.

Capture73

Capture104

Capture94

Click here to read the USFWS December 2011 letter.

.

Click here to read the USFWS Biological Opinion.

Capture73

Capture54

Click here to read entire document from Columbia University.

Capture73

 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • header image text

  • separator

  • veteran owned

    veteran owned
  • separator

  • Archie

  • no 2B-2

  • Loss of gas tax revenues

  • Loss of gas revunues over 18 months

  • No 2B-2

  • Van Note says: Too damn close.

  • no 2B-2

  • Steve on Channel 7

  • no 2b2

  • BACTS Bost

  • no 2B-2

  • Pinochio

  • Van Note – system will suffer

  • Pinochio

  • Chief Engineer

  • no 2B-2

  • Wiscasset Bypass

  • No 2B-2

  • East of Route 46

  • no 2b2

    no 2b2
  • funding system is broken

    funding system is broken
  • no 2b2

    no 2b2
  • 16 percent more

    16 percent more
  • no 2b2

    no 2b2
  • TRIP statistics

    TRIP statistics
  • no 2B-2

  • VanNote aug 2019 rev1

    VanNote aug 2019 rev1
  • no 2b2

    no 2b2
  • Bonds

    Bonds
  • no 2b2

    no 2b2
  • losing ground

    losing ground
  • no 2b2

    no 2b2
  • boondoggle

    boondoggle
  • no 2b2

    no 2b2
  • struggling

  • no 2B-2

  • more miles makes no sense

  • no 2B-2

  • no new infrastructure

  • no 2B-2

  • Search

  • thanks to Gretchen

    thanks to Gretchen
  • SSL

  • copyright

    copyright
"I-395/Route 9 Hard Look"
Proudly powered by WordPress.