"I-395/Route 9 Hard Look"
For most of a decade, state and federal agencies had “determined that an alternative must provide a limited-access connection between I-395 and Route 9 east of Route 46 [and] Alternatives that would connect to Route 9 west of Route 46 would severely impact local communities along Route 9 [and] would substantially increase the potential for new safety concerns and hazards.” Instead, the MaineDOT opted to construct an alternative that did not satisfy that decade-long established Study Purpose or the System Linkage Need and the Traffic Congestion Need.
"I-395/Route 9 Hard Look"
Skip to content
  • Home
  • Facts
    • Letter to the OIG
    • Substantive 2B-2 Facts
    • 2013 FOAA (GH)
    • LD47 Testimony (LA)
    • LD47 Testimony (GH)
    • STIP Comments (GH)
    • STIP Comments (LA)
    • BACTS Testimony (LA)
    • BACTS Testimony (SB)
    • Brewer Boondoggle
    • History was dismissed…
    • We have no money…
    • LD783 Testimony (LS)
    • LD783 Testimony (LA)
    • A viable solution
    • Ides of March 2020
    • What’s the real cost?
    • Virtual Meeting Aug. 2020
    • Strong Towns Article
  • Issues
    • Unmet Purpose & Needs
    • Safety Concerns
    • Change in Route Design
    • Wasted Taxpayer $$
    • Maine’s Unmet Needs
  • Ancillary
    • “Biweekly” DOT Updates
    • Voices of Reason
    • FOAA Discovery
    • Unanswered Questions
    • Important Documents
    • PAC Meetings
  • Maps
    • GIS Data
    • Preliminary Drawings
    • Partial C/L Alignment
    • Official maps – 6.27.2018
    • Prior Mitigation
    • Construction Plans
  • Media
    • Newspapers
    • Letters to the Editor
    • Broadcast Media
    • The early years in the BDN
  • Newsletters
  • Years
    • 2015 News
    • 2016 News
    • 2017 News
    • 2018 News
    • 2019 News
    • 2020 News
    • 2021 News
    • 2022 News
    • 2023 News
    • 2024 News
    • 2025 News
  • Gorham Connector

FOAA Discovery

12.8.2015 c Capture

Capture158

separator-1-2017

 


Official FOAA request from the Town of Eddington to the MaineDOT on October 17, 2012.

Capture36Click here to read entire document. Capture73

 Capture159

 Click here to view pages 001 thru 620.

.

Click here to view pages 621 thru 1,239.

Capture73

 Capture164

Capture165.

Capture215

.

Capture214

.

Capture213.

Capture212

.

Capture211

.

Capture210

.

Capture209 .

Capture208 .

Capture207

.

Capture206 Capture205a

.

Capture205

Click here to view the full Gretchen Heldmann FOAA briefing.

Capture73

 

Capture194

Capture199

Capture73

Capture169

Capture167

Capture168

Click here to view FOAA document #000167 to #000169 in full size.

Capture73

Capture160

Capture123

Capture124

Click here to view FOAA document #000391/000392 in full size.

Capture73

Capture161

Capture125Click here to view FOAA document #000364/000365 in full size.

Capture73

 

Capture162

Capture126Click here to view FOAA document #000431 in full size.

Capture73

Capture163

Capture127

Click here to view FOAA document #001143 in full size.

Capture73

Capture229a

Click here to read email confirming the conversation on April 4, 2013.

Capture201

Capture158

 Capture156

Capture159

Capture153

Capture160

Capture154

Capture228a   Capture155

Capture162

 Capture163

 The above are snippets of each document – click here to view entire document.

.

Click here to view document titled: “A Rebuttal to MDOT Biweekly Report”.

Capture73

Capture197 Capture198 Capture73

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • header image text

  • separator

  • veteran owned

    veteran owned
  • separator

  • Archie

  • no 2B-2

  • Loss of gas tax revenues

  • Loss of gas revunues over 18 months

  • No 2B-2

  • Van Note says: Too damn close.

  • no 2B-2

  • Steve on Channel 7

  • no 2b2

  • BACTS Bost

  • no 2B-2

  • Pinochio

  • Van Note – system will suffer

  • Pinochio

  • Chief Engineer

  • no 2B-2

  • Wiscasset Bypass

  • No 2B-2

  • East of Route 46

  • no 2b2

    no 2b2
  • funding system is broken

    funding system is broken
  • no 2b2

    no 2b2
  • 16 percent more

    16 percent more
  • no 2b2

    no 2b2
  • TRIP statistics

    TRIP statistics
  • no 2B-2

  • VanNote aug 2019 rev1

    VanNote aug 2019 rev1
  • no 2b2

    no 2b2
  • Bonds

    Bonds
  • no 2b2

    no 2b2
  • losing ground

    losing ground
  • no 2b2

    no 2b2
  • boondoggle

    boondoggle
  • no 2b2

    no 2b2
  • struggling

  • no 2B-2

  • more miles makes no sense

  • no 2B-2

  • no new infrastructure

  • no 2B-2

  • Search

  • thanks to Gretchen

    thanks to Gretchen
  • SSL

  • copyright

    copyright
"I-395/Route 9 Hard Look"
Proudly powered by WordPress.